Solar/Photovoltaic Grahovište for sale Bosnia-Herzegovina | Solar park in Bosnia with 560 MWp - for sale

Solar park in Bosnia with 560 MWp - for sale 

ID: PMn-Bn-1/1187764
#Solar #photovoltaic #ForSale #Grahovište #FederationOfBosniaAndHerzegovina #KantonSarajevo #BosniaHerzegovina
Solar/Photovoltaic Grahovište for sale Bosnia-Herzegovina | Solarpark in Bosnien-Herzegowina
Solarpark in Bosnien-Herzegowina
Solar/Photovoltaic Grahovište for sale Bosnia-Herzegovina | Solarpark in Bosnien-HerzegowinaSolar/Photovoltaic Grahovište for sale Bosnia-Herzegovina | QR-Code

Solar/Photovoltaic for sale
€ 160 000 (≈ Au$  259 000) 
BA-71000 Grahovište, Željeznička
Federation of Bosnia and Herzegovina, Bosnia-Herzegovina

Contact owner

 Info >>>
 
 E-mail
   eMail
 All offers of the estate supplier
Description
Project overview
A large-scale solar park in Bosnia with an impressive capacity of 560 MWp is for sale. The solar park consists of several sub-areas that are located in close proximity to each other:

60 MWp (Ready-to-Build - RTB)
200 MWp (shortly before RTB)
6 x 50 MWp (shortly before RTB)
The 60 MWp area is already RTB (Ready-to-Build), while the other areas will reach this status shortly. This project offers investors an excellent opportunity to buy into a strategically planned solar park with high yield potential.

Technical highlights
Capacity: 560 MWp divided into several sub-areas
Electricity yield: approx. 1,480 MWh/MWp, which represents an above-average yield for the location
Grid connection: The solar park has excellent grid connections with a 110 kV and a 400 kV line, which are located next to or partly on the plots
This technical infrastructure ensures that the electricity generated is reliably fed into the grid and supports the efficiency and profitability of the project.

Price structure
Ready-to-Build (RTB) price: €160,000 / MWp, including 50-year lease of the land
COD (Commercial Operation Date) price: €800,000 / MWp for the commissioning and ready-to-build areas
Position
#Grahovište #KantonSarajevo #NovoSarajevoMunicipality
The solar park is located in a sunny region of Bosnia, ideal for the generation of renewable energies. The immediate proximity to high-voltage power lines (110 kV and 400 kV) enables easy connection to the grid. Thanks to the large contiguous areas and stable grid supply, this solar park not only offers high profitability, but also long-term stability and security for investors.
Fittings
This project offers a rare opportunity for investors to buy into a large-scale, well-positioned solar park with high profitability. With the RTB areas (60 MWp) and the additional ready-to-build areas (500 MWp) coming soon, this is a project with enormous potential for both short-term and long-term returns. The robust grid connection and strategic location make this a particularly attractive proposition.

Location: Bosnia
Total capacity: 560 MWp
Partial areas with 60 MWp, 200 MWp and 6x 50 MWp
Price: RTB: €160,000 / MWp (incl. 50-year lease)
Price: COD: €800,000 / MWp (incl. 50-year lease)
Yield: approx. 1,480 MWh/MWp
Disclaimer
Der Autor übernimmt keinerlei Gewähr hinsichtlich der inhaltlichen Richtigkeit, Genauigkeit, Aktualität, Zuverlässigkeit und Vollständigkeit der Informationen. Haftungsansprüche gegen den Autor wegen Schäden materieller oder immaterieller Art, welche aus dem Zugriff oder der Nutzung bzw. Nichtnutzung der veröffentlichten Informationen, durch Missbrauch der Verbindung oder durch technische Störungen entstanden sind, werden ausgeschlossen. Alle Angebote sind unverbindlich. Der Autor behält es sich ausdrücklich vor, Teile der Seiten oder das gesamte Angebot ohne gesonderte Ankündigung zu verändern, zu ergänzen, zu löschen oder die Veröffentlichung zeitweise oder endgültig einzustellen.
rss feed  Digg.com Folkd Reddit Linkarena

Ads

load datadata load ...